Allan Construction is able to complete all its own Excavating and Backfilling required for any new and/or existing utility work with our own Equipment and Operators.

We have several years experience in completing Electrical Ductbanks through out the City of Saskatoon and various Mine Sites. We own an Engineered Shoring System which we utilize for most of the Ductbank work.

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Spadina Lift Station Bypass Building 

Saskatoon SK

Construction of a new bypass lift station complete with :

  • Installation of a new 1200mm diameter pipe from the new wet well to diversion manhole.

  • Due to the spoil conditions a shoring system was installed.

  • All process mechanical, electrical and control systems were included.

Spadina - a
Spadina - 1
Spadina - 3
Spadina - 4
Spadina - 2
Spadina - 6
Spadina - 5
Spadina - 7
Spadina - 11
Spadina - 8
Spadina - 9
Spadina - 10

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Acadia Drive Reservoir Pumping and Piping Upgrades ​

Saskatoon SK

  • Responsible for the engineering and installation of a new shoring system to allow for the construction of a new concrete valve chamber without disturbing the existing reservoir and pumping station

  •  A new 900mm diameter casing sleeve was installed by directionally boring under the existing reservoir and connecting to the new sump pit in the reservoir.

  • Installation of a new 1200mm diameter header and 750mm diameter draw lines from the existing reservoir.

  • Installation of new sump within the reservoir.

  • Removal and replacement of valves and piping within existing pump station.

  • Soft Landscaping.

acadia-2
acadia-1
acadia-5
acadia-3
acadia-7
acadia-4
acadia-6
acadia-8

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Dream Development - Brighton Pond

Saskatoon SK

 

  • ​500,000m3 of area grading and pond construction

  • 644 lm of storm utilities, control chamber and manholes​

BrightonWater-2
BrightonWater-10
BrightonWater-1
BrightonWater-9
BrightonWater-8
BrightonWater-7
BrightonWater-6
BrightonWater-4
BrightonWater-3
BrightonWater-5

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

City Of Saskatoon - Duct Banks

Saskatoon SK

 

  • ​Construction of concrete encased electrical ductbanks thru out the City of Saskatoon.

  • Installation of an engineered shoring system inside a straight walled excavation. Installation of all required pipe supports, spacers, PVC ducts, rebar and concrete.

  • Fillcrete backfill was placed to the underside of the new asphalt structure

  • Installation of precast manholes

duct-banks - 1
duct-banks - 2
duct-banks - 3
duct-banks - 4

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Chinook Power Station

Swift Current SK

 

  • ​10,000 lm of buried piping, high pressure air lines and electrical conduits

Util - Chinook 1
Util - Chinook 3
Util - Chinook 6
Util - Chinook 5
Util - Chinook 2
Util - Chinook 4
Util - Chinook 7

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

SaskPower - Sewage Handling System Upgrades

Island Falls SK

  • ​Renovations of existing sewage handling system

  • Removal of 3 existing storage tanks, installation of 1 new one

  • New underground piping of 2 new sewage mounds

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Jackfish Lake Campground Infrastructure Construction

​Jackfish Lake  SK

  • Construction of 99 new campsites complete with new water and sewer connections.

  • Construction of a new water treatment plant/sanitary service building and a new washroom building.

  • Installation of owner supplied water treatment equipment and FRP storage tank.

  • Installation of a new lift station and connection to the existing well.

drone 002
drone 005
drone 007
drone 006
drone 001
drone 004

Alloy Collision Center

Location: Saskatoon Sk

Client: Vaughn Wyant Investments Inc.

Muskoday First Nation Sewage Pumping Station Replacement

​Muskoday First Nation  SK

Construction of a new Sewage Pumping Station including :

  • Dry and Wet Well, Building Construction, Mechanical, Electrical and Underground Utilities.

  • The existing Pump Station was decommissioned and utilities were abandoned/capped.

IMG_0633