Road Building

Allan Construction does the complete roadway construction to the granular base level in accordance with the drawings and specifications. This involves earthworks, subgrade preparation, subbase gravel and base gravel.

 

 
Project Name
Highway 7 & 14 Interchange
Location
Saskatoon
Client
City of Saskatoon/Central
Asphalt
Status
Complete

Highway 7 & 14 Interchange

We completed this contract as a sub-trade for Central Asphalt.

Our contract included all earthworks and the supply and installation of all granular subbase and base material.

 

 

 
Project Name
RM Road Fertile
Valley / Milden
Location
Dinsmore, SK
Client
AMEC Engineering
Status
Complete

RM Road Fertile Valley / Milden

Reconstruction of 9.6km of road for the RM's. Excavation to embankment, installation of culverts and gravel incorporation.                                                                          

 

 
Project Name
Road Reconstruction #1
Location
Circle Drive
Saskatoon, SK
Client
City of Saskatoon
Status
Completed - 2013
317 103rd Street East Saskatoon SK S7N 1Y9 p: (306) 477-5520 f: (306) 477-5521 e: info@allanconstruction.ca