Earth Works

Allan Construction has an extensive fleet of Light Duty and Power Mobile Equipment that continues to grow and improve every year. We are able to complete all Earthworks with our own Equipment and Trained Operators.

We have Topcon GPS installed on our Power Mobile Equipment which now enables us to excavate and place all subbase and base to the specified depths with accurate precision.

 

 

 
Project Name
PCS Patience
Injection Expansion
Location
Patience Lake, SK
Mine Site
Client
PCS
Status
Complete

PCS Patience  - Injection Expansion

Installation of 14KM of double walled pipeline to the Patience Lake Mine Site. Construction of concrete pull stations every 700m along the pipeline. Construction of 4 Head Houses at the wellheads.

 

 
Project Name
CP Rail - Arpiers
Location
Arpiers, SK
Client
CP Rail
Status
Complete

CP Rail - Arpiers

Construction of 2 miles of new rail line siding. Stripping the existing topsoil, site grading, sub-ballast installation and culvert installation.

 

http://allanconstruction.ca/plugins/picker/manager/../../userData/brighton_2.jpg

http://allanconstruction.ca/plugins/picker/manager/../../userData/brighton_3.jpg

http://allanconstruction.ca/plugins/picker/manager/../../userData/brighton_4.jpg

http://allanconstruction.ca/plugins/picker/manager/../../userData/brighton_1.jpg

317 103rd Street East Saskatoon SK S7N 1Y9 p: (306) 477-5520 f: (306) 477-5521 e: info@allanconstruction.ca